Rivelin


Renewable Energy Scheme:  
Rivelin
Client:   Yorkshire Water


This renewable energy project involved installing a 120kW Francis Turbine at the inlet to the Rivelin Water Treatment Works to recover energy from the raw water as it arrives.

rivelin_1.jpg

Raw water arrives at the site from Rivelin Lower Reservoir and the Derwent Tunnel.

We had to make relatively small modifications to the existing site infrastructure to install the hydro-turbine, which has now been running successfully since the end of 2008. 

All renewable energy generated is used on the treatment works site.

The below table provides some brief details of the scheme:
 

Turbine 120kW
Annual Energy Generated 895 MWh
Flow 36 - 70 Ml / d
Head 16 - 23m