|
|
Rivelin
Raw water arrives at the site from Rivelin Lower Reservoir and the Derwent Tunnel. We had to make relatively small modifications to the existing site infrastructure to install the hydro-turbine, which has now been running successfully since the end of 2008. All renewable energy generated is used on the treatment works site. The below table provides some brief details of the scheme:
|
||||||||||||

