2008 Top 25

To compile our league table, our project teams apply a simple weighted scoring system to every completed order against a set of categories to calculate an overall performance score with 1 being the maximum score.  (1 = excellent performance, 2.75 = satisfactory and 5 = poor.)  For additional information, you can download a copy of our Performance Report Scoring Matrix here.

In 2008, our minimum acceptable standard for our 396 subcontract suppliers remained set at 2.75 and we conducted over 1,800 Performance Reports on orders.  The average score for all suppliers in 2008 was 1.98, an average which has improved year on year for the last five years.  Only a small minority failed to meet our minimum acceptable standard in 2008, and with many exceeding it, the standard of those making our top 25 continues to be outstanding.

Below is a list of the subcontractors who made it into our top 25 for 2008 (in alphabetical order):

- Boretech Linc Ltd
- Carlton Manor (North East) Ltd
- Collingham Catering Services Ltd
- CRM Rainwater Drainage Consultancy Ltd
- Cyril Isaacs & Co Ltd
- Dew Piling Ltd
- EnviroCleanse Ltd
- G Clarke Landscaping Ltd
- GP Gill Ltd
- Galeforce Civil Engineering Ltd
- Hartlington Fencing Supplies
- Holemasters Demtech Limited
- John C Wilkins Lts
- LAM Associates (UK) Ltd
- Longwood Engineering Co Ltd
- M&C Fitton
- Nicol UK Ltd
- Norman Jarvis & Son
- Pump Supplies Ltd
- Reid Pipeline Services Ltd
- Sutcliffe Construction Ltd
- The National Electical Certification & Training Alliance
- Total Automated Solutions
- Trax Portable Access Ltd
- Utile Engineering Co. Ltd